16 October 2026                                Business Spotlight  |  Editorial Extra  |  News  |  Podcasts  |  About us  |  Home

Industry Guide


Archive




2001-02-23 TfL-001

Transport for London

Report to Ken Livingstone, Mayor of London, on the London Underground’s proposed PPP


keywords: click to search

London Transport
Transport for London
public-private partnerships
*PPP

notes
By Robert Kiley, Commissioner of Transport for London.







Words in [single square brackets] included hyperlinks in the original document

Words in [[double square brackets]] are editorial additions or corrections

Words in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.)




< operators’ contracts index





Publication


Transport for London

Report to Ken Livingstone, Mayor of London, on the London Underground’s proposed PPP


  date 23 February 2001
  source Transport for London
  type Publication

For the past three years, the Government has been engaged in an effort to enter into a Public Private Partnership (PPP) on behalf of London Underground, after which ownership of London Underground would be transferred to Transport for London (TfL). Under the Government’s plan, control of the Underground, however, would remain in private hands. This is the first report on this process based upon access to virtually all relevant information.

Last November, the Mayor requested that Transport for London examine the proposed PPP and report its conclusions. That report, submitted to the Mayor on 13 December 2000, concluded that the PPP, as then understood by TfL, based on the limited information made available by the Government, was “fatally flawed”. At the same time, Transport for London put forth an alternative plan for the reconstruction and renewal of the London Underground under the direction of a chief executive with responsibility for all aspects of this critical public asset.

Our work since December, described below, confirms the fundamental conclusions of the December report. The “fatal flaw” is simply that the public will own the system, but not control it. The result is a divided management structure that will leave the public managers with no practical means of effectively operating the transport system or ensuring the safety of its millions of daily customers. In short, implementation of the PPP would be unsafe, inefficient and prohibitively expensive.

[[for full report click on link in related documents]]


Railnews Archive ::: 2001-02-23 TfL-001








related documents



2001-02-23 Report to Ken Livingstone, Mayor of London, on the London Underground’s proposed PPP (Transport for London)

2001-02-02 Prescott and Kiley agree to work together on the London Underground Public Private Partnership (Department of the Environment, Transport and the Regions)

2000-12-13 Commissioner tables alternative to 'fatally flawed' PPP (Greater London Authority)

2000-03-30 Pressing ahead with the PPP - Public Sector Comparator details published (Department of the Environment, Transport and the Regions)

2000-03-28 Keith Hill welcomes tube PPP progress (Department of the Environment, Transport and the Regions)