15 April 2026                                Business Spotlight  |  Editorial Extra  |  News  |  Podcasts  |  About us  |  Home

Industry Guide


Archive




2001-09-01 ANG-001

Anglia Railways

London Crosslink


keywords: click to search

Anglia Railways




Words in [single square brackets] included hyperlinks in the original document

Words in [[double square brackets]] are editorial additions or corrections

Words in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.)




< operators’ contracts index





Press release


Anglia Railways

London Crosslink


  date 1 September 2001
  source Anglia Railways
  type Press release

Anglia Railways’ new London Crosslink service between Colchester or Chelmsford and Basingstoke commenced in 29 May 2000.

Avoiding the need to change in London, there are six trains a day (Mondays to Saturdays with fewer trains on Sundays) in each direction with a two hour frequency. The service calls at Stratford, Highbury & Islington, West Hampstead, Feltham (for Heathrow Airport), Staines, Woking, Farnborough and Basingstoke.

WHY NOT CHECK OUT OUR NEW LONDON CROSSLINK MINI-SITE TO FIND OUT MUCH MORE ABOUT THIS GREAT SERVICE.


Railnews Archive ::: 2001-09-01 ANG-001








related documents



2001-02-06 Winning back passengers! (Anglia Railways)

2001-01-15 New timetables bring further rail improvement (ATOC)

2001-01-02 Train operators support enforcement action (ATOC)

2000-12-14 A message to customers (Anglia Railways)

2000-12-07 Bringing passengers back onto the trains (Anglia Railways)