Words in [single square brackets] included hyperlinks in the original document
Words in [[double square brackets]] are editorial additions or corrections
Words in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.)
date 6 February 2003 source Network Rail type Written statement
London & South East
Safety is Network Rail’s first priority, without question. Level crossings have a hundred percent safety record when used correctly. It is only when the ‘green cross code’ of level crossings is abused that incidents happen. The crossing at Blaxhall, near Wickham Market was extensively damaged in the incident on 15 April 2002. Since then a Network Rail attendant has been manually operating the crossing, which has had temporary gates installed. This crossing is made to measure and involves many components, including signalling, lighting and power equipment. The new crossing will be reinstalled in a few months time.
Contact information
Media Relations (London & South East) 020 3356 9166 / 9164 mediarelations@networkrail.co.uk