12 September 2026                                Business Spotlight  |  Editorial Extra  |  News  |  Podcasts  |  About us  |  Home

Industry Guide


Archive




2010-04-30 GCR-002

Grand Central

Bradford gets three new London trains from 23 May


keywords: click to search

Bradford
Grand Central
open access




Words in [single square brackets] included hyperlinks in the original document

Words in [[double square brackets]] are editorial additions or corrections

Words in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.)




< operators’ contracts index





Press release


Grand Central

Bradford gets three new London trains from 23 May


  date 30 April 2010
  source Grand Central
  type Press release

Grand Central today confirmed the timetable for its new West Riding service that will see Bradford and London linked by three additional return services a day.

The new West Riding service which will start on the 23rd May offers three direct Intercity style services a day between Bradford Interchange and London King’s Cross (calling at Halifax, Brighouse, Wakefield Kirkgate, Pontefract and Doncaster).

Trains will depart Bradford for London at the following times on Weekdays:
06:51 (arr 10:06), 10:22 (arr 13:46) and 15:22 (arr 18:46)
Return services direct to Bradford from London will depart King’s Cross at:
10:50 (arr 13:54), 14:20 (arr 17:39) and 19:48 (arr 23:12)

In preparation for the start of the new West Riding service at the end of the month Grand Central recently began test train running and the company’s distinctive orange and black high speed class 180 trains have become a regular sight at Bradford’s Interchange station.

Grand Central has also recruited 30 Bradford based members of staff in roles ranging from Train Driver to Customer Service Assistant and support staff, to operate the new service, most of whom have been recruited from along the new West Riding route.

Note to Editors
Grand Central currently operates its North Eastern service of four return weekday services linking Sunderland, Hartlepool, Eaglescliffe, Northallerton, Thirsk, York with London King’s Cross. The Company is an Open Access Operator; is privately owned; and has no links with the Franchised Operators specified by the DfT.
In February of 2009 the Office of Rail Regulation granted Grand Central access rights to operate three return services between London King’s Cross and Bradford Interchange. The primary purpose of Open Access Operators is to provide direct links between communities where none formerly existed.
Grand Central signed a lease in August 2009 for three Class 180 trains that will operate the West Riding services.
Grand Central offers competitive and easy to understand fares which can be bought at the same price whether obtained On Line, On Train or At Staffed Station. Seat Reservations are free of charge and passengers to/from London can partake of a free tea or coffee on board.


Railnews Archive ::: 2010-04-30 GCR-002








related documents



2008-12-18 Grand Central - the first 365 days! (Grand Central)