16 October 2026                                Business Spotlight  |  Editorial Extra  |  News  |  Podcasts  |  About us  |  Home

Industry Guide


Archive




2012-07-16 DfT-001

Department for Transport

High Level Output Specification (HLOS) 2012: Railways Act 2005 statement


keywords: click to search

Crossrail
East West rail link
Great Western Main Line
GWML
Midland Main Line
MML
Sheffield
Swansea
Thameslink Programme
capital spending plans
electrification
railway investment




Words in [single square brackets] included hyperlinks in the original document

Words in [[double square brackets]] are editorial additions or corrections

Words in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.)




< operators’ contracts index





Policy paper


Department for Transport

High Level Output Specification (HLOS) 2012: Railways Act 2005 statement


  date 16 July 2012
  source Department for Transport
  type Policy paper

The High Level Output Specification (HLOS) sets out information for the Office of Rail Regulation and for the rail industry about what the Secretary of State wants to be achieved by railway activities during railway Control Period 5 (April 2014 – March 2019). The HLOS is a statutory requirement introduced by the Railways Act 2005.

Secretary of State for Transport’s Guidance to the Office of Rail Regulation
This is general guidance issued by the Secretary of State to the Office of Rail Regulation (ORR) under the terms of the Railways Act 1993. The ORR must take account of this guidance in carrying out its functions as economic and safety regulator for the railways.

Illustrative Option schemes in CP5 HLOS

Alongside HLOS, Government publishes an illustrative option. This sets out the list of projects that Government considers might be required to deliver the high level outputs that it specifies. Government looks to the rail industry to improve and find better ways of delivering the HLOS outputs.


Railnews Archive ::: 2012-07-16 DfT-001